Plastics processing and moulding · Manufacturing

Price every moulded part on the resin and machine time it really uses

A plastics processor buys polymer at this week's price and sells parts at last quarter's. We cost each part from shot weight, regrind, cycle time and machine tonnage. We also track how much of every resin price movement has actually been passed on.

In one paragraph

Injection-moulding, blow-moulding, extrusion and thermoforming units live on the spread between polymer prices and part prices. Most turn over ₹10–300 crore and supply appliance, automotive, FMCG, pharmaceutical and building-products customers. Resin dominates cost and moves with petrochemical prices. Conversion cost depends on the machine, the mould and the cycle time of each part. The owner or managing director usually leads the work.

Who usually engages us

Owner or managing director

The economics

How the money moves in this trade

Polymer is usually the largest single cost. Its price follows feedstock and supplier price lists that change frequently. Customer prices are typically revised on a lag, sometimes on a formula and sometimes by negotiation, so margin swings with every move in the polymer market. Masterbatch, additives and the share of regrind allowed in the part all change the material cost. Runners, start-up scrap and purge material add weight that is never sold.

Conversion cost depends on machine tonnage, cycle time, the number of working cavities and power. Moulds may belong to the customer or to the processor, and their maintenance, cavity blocking and replacement decide output. A processor that makes plastic packaging, or intermediate material for it, counts as a producer under the plastic waste management rules. Its extended producer responsibility obligations have to be tracked and costed alongside production.

The problem

Where the numbers usually break down

Resin pass-through is never reconciled

Price revisions are agreed with customers, but nobody compares them with the actual resin cost movement over the same period.

Regrind and purge are not costed

Runners, start-up scrap and purge are reground or sold without a record, so material yield per part is unknown.

One machine-hour rate for all tonnages

A small and a large press carry the same conversion rate, so large parts are under-priced and small ones over-priced.

Cavity blocking cuts output unseen

Moulds run with blocked cavities after damage, halving output per shot while the part is still priced on full cavitation.

Customer-owned moulds are not tracked

Moulds held on behalf of customers are not registered, insured or reconciled, and their maintenance cost is absorbed.

What we do

The work, and the result each part produces

Part costing from shot weight and cycle time

Material per part from shot weight, runner weight and regrind ratio, and conversion from cycle time and the actual press used.

Each part's cost reflects its own process.

Machine-hour rates by tonnage class

Separate rates for each band of press tonnage, built from depreciation, power, maintenance, labour and utilisation.

Large and small parts are priced on their own machines.

Resin pass-through tracker

Resin purchase prices compared with customer price revisions by grade and customer, with the gap quantified each month.

Unrecovered resin cost is visible and claimable.

Material yield and regrind reconciliation

Resin issued, parts produced, regrind generated and reused, and scrap sold reconciled by weight.

Material loss is traced to a part or a press.

Mould register and maintenance costing

Every mould recorded with its owner, cavitation, working cavities, shot count and maintenance cost.

Mould condition is treated as a cost driver.

EPR obligation tracking

Quantities of plastic packaging placed on the market recorded in the form the obligation requires, with the cost of meeting it accrued.

EPR is a known cost rather than a year-end surprise.

Where we start

The first steps of an engagement

  1. Resin purchases and mould records

    We ask for resin purchase invoices by grade, the customer price-revision history, part-wise shot weight and cycle time, the press list by tonnage and the mould register if one exists.

  2. Resin cost against price recovered

    For the main customers and grades, resin cost movement over recent quarters is set against the price revisions actually agreed.

  3. Rates by press tonnage

    Machine-hour rates are split by tonnage class, and regrind, purge and start-up scrap start being recorded by part and press.

  4. A resin pass-through report

    The first report shows resin cost movement against price recovered by customer and grade, with part costs restated on the new machine rates.

How it is measured

The reports the work is judged on

Each is recorded as a baseline before the work starts, so later reports have an honest comparison.

  • Resin cost movement against price recovered, by customer
  • Material yield and regrind ratio, by part
  • Machine utilisation by tonnage class
  • Working cavities against designed cavities
  • Contribution per machine hour, by part
  • EPR obligation accrued against met

Who it suits

Written for, and not the right fit for

Not the right fit if
  • You need EPR registration, returns or certificates filed with the regulator on your behalf — that filing is your own responsibility, and we prepare the data for it.
  • You make printed flexible packaging rather than moulded or extruded products — our packaging page is the closer fit.
Written for
  • Injection-moulding, blow-moulding, extrusion and thermoforming processors.
  • Processors supplying appliance, automotive, FMCG or pharmaceutical customers.
  • Units whose margins swing with polymer prices without a clear explanation.

Common questions

Questions owners in this trade ask

How do we recover resin price increases without a formula?

Even without a formula, a monthly record of resin cost against what's been recovered gives you a factual basis for each price conversation. It's harder to refuse a revision when the gap is quantified by grade.

Does EPR apply to plastic moulders?

It can. Makers of plastic packaging, and of the intermediate material it is made from, are treated as producers under the plastic waste rules. Whether that covers your products is a regulatory question for you and your adviser; we help you hold the quantity data the obligation needs and cost it properly.

Is it worth tracking cycle time by part?

Usually, yes. Cycle times tend to drift from the figure used in the quotation, and a few seconds on a high-volume part changes its cost noticeably.

Scope and professional coordination

5th Quadrant performs costing, accounting and reporting. Registration, returns and certificates under extended producer responsibility rules are the client's own responsibility with the regulator; we prepare the underlying data and support. Statutory audit and prescribed certifications are signed by an independently engaged licensed professional. Full detail is on our Professional Scope page.

Explore further

Other trades in this sector

Precision engineeringA blended hourly rate hides which parts lose money; we cost each part from the machine hours, tooling and scrap it actually consumed.View trade ↗Industrial machineryEngineered-to-order machines are often costed like catalogue products; we cost each one as its own project, from the first design hour to commissioning.View trade ↗Heavy equipmentWe track every heavy-equipment order's guarantees, delay penalties and staged receivables from tender to final payment, because those decide the margin.View trade ↗Electrical equipmentCopper, aluminium and electrical-steel prices move after the order is priced; we cost metal content per unit and compute every price-variation claim the contract allows.View trade ↗Industrial automationSeparating hardware margin from engineering margin on each project shows whether you earn on expertise or on resale, which a blended project margin hides.View trade ↗Metal fabricationThe gap between steel bought and steel billed is where fabricators lose money; we reconcile steel, scrap and drawing weight on every job.View trade ↗FoundriesPlant-wide yield, melting loss and power figures hide which patterns lose money; costing each pattern from metal poured, good castings shipped and energy used shows them.View trade ↗Forging and precision castingDie and tooling cost is spread across volumes that often never arrive; tracking die life and amortisation part by part against actual output shows what remains unrecovered.View trade ↗PackagingWe cost every packaging job from the board or film consumed, its cylinders or plates and its set-up waste, so short runs are priced for what they cost.View trade ↗Pumps, valves and compressorsCatalogue products and engineered project orders share a plant but not a cost; we separate the two and cost each project from its castings, testing and documentation.View trade ↗
Back to Manufacturing ↗

Tell us how your business actually runs.

Discuss your requirements