Industrial automation · Manufacturing

Separate the hardware margin from the engineering margin on every automation project

An automation integrator sells hardware, engineering and commissioning in one price, and usually only knows the blended result. We split each project into the margin on bought-in hardware and the margin on your engineers' time. You can then see which one you are actually in business for.

In one paragraph

System integrators earn most of their value from engineering time that is rarely recorded against the project. They include PLC, SCADA and drives integrators, control-panel builders, and robotics and machine-vision firms. Most turn over ₹10–200 crore and sell to plant owners and machine builders. A large share of revenue is third-party hardware with a thin margin. The founder or managing director usually leads the work, often with the head of projects.

Who usually engages us

Founder or managing director, often with the head of projects

The economics

How the money moves in this trade

A typical automation project bundles PLCs, drives, sensors and robots bought from brand principals with a control panel built in-house. Add application software written by your engineers and a period of commissioning at the customer's plant. Hardware is often imported or bought from a distributor at a negotiated discount, with targets and rebates attached. Engineering is priced as a lump sum and consumed in hours that stretch when the customer's plant is not ready.

The project can look profitable on paper because hardware margin is booked at dispatch. Engineering overruns, extra site visits and post-commissioning support are spread across salaries and travel. Annual maintenance contracts, software licences and remote support add recurring income. That income has to be recognised over time rather than when it is billed.

The problem

Where the numbers usually break down

Hardware and engineering margins are blended

Project profitability is reported as one number, so a project that lost money on engineering looks fine because of the hardware it carried.

Engineer time is not booked to projects

Programming, testing and site hours go unrecorded or are recorded in a separate tool that never reaches the accounts.

Site waiting time is never charged

Engineers wait at the plant for the customer's equipment or approvals, and the extra days are absorbed rather than raised as a variation.

Principal rebates and targets are untracked

Volume rebates from automation brands are recorded when received, not when earned, so the hardware margin by project is misstated.

Maintenance contracts are booked when billed

Annual contracts and support plans are taken to revenue on invoice, overstating the month they are billed and hiding the support cost that follows.

What we do

The work, and the result each part produces

Project costing in two layers

Each project split into hardware cost and margin, and engineering and commissioning cost and margin, from quotation to close.

You see which projects earn on expertise and which only on resale.

Engineer utilisation and time booking

Billable and non-billable hours captured by project and engineer, with a cost rate built from actual salary and overhead.

Engineering capacity is priced and planned from evidence.

Variation and site-delay records

Customer-caused delays and scope additions logged during the project with a priced variation raised.

Extra site days are paid for.

Import, duty and foreign-exchange costing

Landed cost of imported hardware including duty, freight and exchange movement, matched to the project that used it.

Quoted hardware margins survive the exchange rate.

Principal rebate accrual

Target-linked rebates estimated as purchases are made and allocated to the projects that earned them.

Hardware margin is stated correctly month by month.

Recurring revenue and deferred income

Maintenance contracts, licences and support plans recognised over their term, with their cost reported alongside.

The recurring business shows its true margin.

Where we start

The first steps of an engagement

  1. Project files and principal terms

    We ask for quotations and purchase orders for recent projects, import and distributor invoices, the principals' rebate terms, any engineer time logs and the list of maintenance contracts.

  2. Split closed projects in two

    A sample of closed projects is split into hardware cost and margin and engineering cost and margin, using landed hardware cost and an hourly engineer rate.

  3. Hours and rebates against projects

    Engineer hours start being booked to project codes, and principal rebates are accrued as purchases are made rather than when they are received.

  4. A two-layer project margin report

    The first report shows hardware margin and engineering margin for each project reviewed, with site days planned against actual.

How it is measured

The reports the work is judged on

Each is recorded as a baseline before the work starts, so later reports have an honest comparison.

  • Hardware margin and engineering margin, by project
  • Engineer utilisation, billable against available
  • Site days planned against actual
  • Variations raised and recovered
  • Landed cost of imported hardware, against quotation
  • Recurring revenue and its margin

Who it suits

Written for, and not the right fit for

Not the right fit if
  • You are a pure distributor of automation hardware with no engineering content — our trading and distribution work is a closer fit.
  • You want a project-management or field-service tool selected and implemented; we work inside the systems you already run.
Written for
  • PLC, SCADA and drives integrators, control-panel builders and robotics or machine-vision firms.
  • Founder-led engineering firms where the founder still prices every project.
  • Firms adding maintenance contracts or software products to project revenue.

Common questions

Questions owners in this trade ask

Why split hardware and engineering margin on automation projects?

Because they behave differently. Hardware margin is set by your principal's discount; engineering margin is set by how well you estimate and control hours. If you only see the blend, you can't tell which one to fix.

Can engineer hours from our project tool feed project costing?

Yes. We'd take the hours from the tool you already use and bring them into project costing with a cost rate attached. The gap is usually the link between the two, not the data itself.

How should automation maintenance contracts be accounted for?

Generally over the period the service is provided rather than when invoiced. We set out the treatment for your contract types and agree it with your statutory auditor.

Explore further

Other trades in this sector

Precision engineeringA blended hourly rate hides which parts lose money; we cost each part from the machine hours, tooling and scrap it actually consumed.View trade ↗Industrial machineryEngineered-to-order machines are often costed like catalogue products; we cost each one as its own project, from the first design hour to commissioning.View trade ↗Heavy equipmentWe track every heavy-equipment order's guarantees, delay penalties and staged receivables from tender to final payment, because those decide the margin.View trade ↗Electrical equipmentCopper, aluminium and electrical-steel prices move after the order is priced; we cost metal content per unit and compute every price-variation claim the contract allows.View trade ↗Metal fabricationThe gap between steel bought and steel billed is where fabricators lose money; we reconcile steel, scrap and drawing weight on every job.View trade ↗FoundriesPlant-wide yield, melting loss and power figures hide which patterns lose money; costing each pattern from metal poured, good castings shipped and energy used shows them.View trade ↗Forging and precision castingDie and tooling cost is spread across volumes that often never arrive; tracking die life and amortisation part by part against actual output shows what remains unrecovered.View trade ↗Plastics processing and mouldingResin moves weekly and customer prices quarterly, so margin swings unseen; costing each part from resin, regrind and machine time exposes the pass-through gap.View trade ↗PackagingWe cost every packaging job from the board or film consumed, its cylinders or plates and its set-up waste, so short runs are priced for what they cost.View trade ↗Pumps, valves and compressorsCatalogue products and engineered project orders share a plant but not a cost; we separate the two and cost each project from its castings, testing and documentation.View trade ↗
Back to Manufacturing ↗