Let’s talk

Metal fabrication · Manufacturing

Reconcile the steel you bought with the tonnes you billed on every fabrication job

A fabricator is paid by the tonne or by the job. It loses money in the gap between the steel it bought and the steel it billed. We reconcile that gap on every job, along with the labour contractors, outside processing and site erection that usually sit outside the cost sheet.

In one paragraph

Fabricators are often paid per kilogram of finished weight but spend by the plate, the offcut and the welder's hour. They build structural steel, sheet-metal work, tanks, skids and process equipment for EPC contractors, plant owners and OEMs. Most turn over ₹10–250 crore. Cost is driven by plate and section sizes, cutting wastage and the hours of contract welders and fitters. The owner or managing director usually leads the work.

Who usually engages us

Owner or managing director

The economics

How the money moves in this trade

Fabrication cost is mostly steel and labour. Steel is bought in standard plate and section sizes and cut to the drawing, leaving offcuts and scrap that may or may not be reused. Billing is commonly on theoretical or drawing weight, so wastage, over-thickness or rework is cost the customer does not pay for. Labour is often supplied by contractors on piece rates or per tonne. Welding consumables, gases and outside processes such as galvanising, painting or blasting come on top.

Larger jobs are billed through running account bills certified by the customer's engineer. Retention is held back, and site erection runs months after shop work ends. Customers may supply their own steel for conversion, which brings job-work records and material-return obligations. A shop can be busy all year and still not know which jobs paid for the others.

The problem

Where the numbers usually break down

Billed weight and consumed weight are never compared

Steel issued to a job is not reconciled with the weight billed, so wastage above the norm stays invisible.

Offcuts and scrap leak value

Usable offcuts are not recorded for reuse and scrap sales are not matched to the jobs that generated them.

Labour contractor bills are paid without a measure

Contractors are paid per tonne or per day without the quantity being checked against the job's actual progress.

Running bills lag the work done

Work completed at site waits weeks for measurement and certification, while the contractor and steel supplier must be paid now.

Customer-supplied steel drifts from the books

Material received for conversion is tracked loosely, and returns of scrap and finished goods are not reconciled to what was received.

What we do

The work, and the result each part produces

Job costing on a weight basis

Steel issued, steel billed, labour, consumables and outside processing recorded per job and compared with the estimate per tonne.

Each job shows its true cost per tonne.

Steel and scrap reconciliation

Opening stock, purchases, issues, offcuts and scrap sales reconciled monthly in weight and value.

Wastage above the norm is traced to a job.

Labour contractor control

Contractor bills checked against measured quantities and job progress before payment, with statutory compliance records collected.

You pay for work done, and only once.

Running bill and retention tracker

Work done, billed, certified and paid tracked per job, with retention release dates diarised.

Unbilled work is converted to bills quickly.

Job-work material accounting

Customer-supplied steel tracked in, through and out, and kept consistent with the job-work records your customer reports under GST.

Customer material reconciles at both ends.

Site erection costing

Erection labour, cranes, travel and site overheads booked to the job they belong to.

Site work stops eroding shop margin unseen.

Where we start

The first steps of an engagement

  1. Steel registers and running bills

    We ask for steel purchase and issue records, drawing-weight billing for recent jobs, scrap sale invoices, labour contractor bills and the running-bill and retention file.

  2. Steel bought against steel billed

    For a sample of completed jobs, steel issued is reconciled with weight billed, offcuts and scrap sold, and wastage is measured against the estimate.

  3. Measured quantities before contractor payment

    Contractor bills start being checked against measured quantities and job progress before payment, and each job gets its own steel issue record.

  4. A cost-per-tonne report by job

    The first report shows estimated against actual cost per tonne for the jobs reviewed, with wastage, labour and outside processing shown separately.

How it is measured

The reports the work is judged on

Each is recorded as a baseline before the work starts, so later reports have an honest comparison.

  • Cost per tonne, estimated against actual, by job
  • Wastage as a share of steel issued
  • Scrap recovery against expected scrap
  • Labour cost per tonne, by contractor
  • Unbilled work and retention outstanding
  • Customer-supplied material reconciled

Who it suits

Written for, and not the right fit for

Not the right fit if
  • You need pressure-equipment design approval or statutory inspection — that sits with the competent authority and approved inspectors.
  • You need the annual audit or tax-audit report signed — an independently engaged CA signs it, and our steel and job-work reconciliations are among the records it draws on.
Written for
  • Structural steel, sheet-metal, tank and process-equipment fabricators.
  • Fabricators working for EPC contractors on running-bill terms.
  • Shops relying on labour contractors for most of their welding and fitting.

Common questions

Questions owners in this trade ask

What is a reasonable steel wastage norm for fabrication?

It depends on the work — plate-heavy jobs and section-heavy jobs differ a lot. We'd build the norm from your own completed jobs rather than use an industry figure, and then track each job against it.

Who is responsible for labour contractor compliance?

Registrations and filings remain the contractor's and your responsibility. We check that contractors' statutory records are collected before payment and keep the payment trail consistent with them.

Should a fabricator bill on drawing weight or actual weight?

Not necessarily. Many customers insist on it. What matters is that your quoted rate per kilogram covers the wastage you actually incur, and that only becomes clear when the two weights are compared.

Explore further

Other trades in this sector

Precision engineeringA blended hourly rate hides which parts lose money; we cost each part from the machine hours, tooling and scrap it actually consumed.View trade ↗Industrial machineryEngineered-to-order machines are often costed like catalogue products; we cost each one as its own project, from the first design hour to commissioning.View trade ↗Heavy equipmentWe track every heavy-equipment order's guarantees, delay penalties and staged receivables from tender to final payment, because those decide the margin.View trade ↗Electrical equipmentCopper, aluminium and electrical-steel prices move after the order is priced; we cost metal content per unit and compute every price-variation claim the contract allows.View trade ↗Industrial automationSeparating hardware margin from engineering margin on each project shows whether you earn on expertise or on resale, which a blended project margin hides.View trade ↗FoundriesPlant-wide yield, melting loss and power figures hide which patterns lose money; costing each pattern from metal poured, good castings shipped and energy used shows them.View trade ↗Forging and precision castingDie and tooling cost is spread across volumes that often never arrive; tracking die life and amortisation part by part against actual output shows what remains unrecovered.View trade ↗Plastics processing and mouldingResin moves weekly and customer prices quarterly, so margin swings unseen; costing each part from resin, regrind and machine time exposes the pass-through gap.View trade ↗PackagingWe cost every packaging job from the board or film consumed, its cylinders or plates and its set-up waste, so short runs are priced for what they cost.View trade ↗Pumps, valves and compressorsCatalogue products and engineered project orders share a plant but not a cost; we separate the two and cost each project from its castings, testing and documentation.View trade ↗
Back to Manufacturing ↗

Tell us how your business actually runs.

Discuss your requirements