Let’s talk

Packaging · Manufacturing

Cost every packaging job from the board, film and make-ready it consumed

A packaging converter quotes per thousand units and loses margin to make-ready waste, short runs and artwork changes. We cost each job from the substrate it consumed, the cylinders or plates it needed and the waste it generated. Pricing then reflects the run length the customer actually orders.

In one paragraph

Corrugated box makers, folding-carton and label printers and flexible-packaging converters run many small, printed, customer-specific jobs. Most turn over ₹10–300 crore and supply FMCG, pharmaceutical, food and e-commerce customers. Each job has its own artwork, tooling and waste. Stock becomes worthless the day the customer changes its design. The managing director or finance head usually leads the work.

Who usually engages us

Managing director or finance head

The economics

How the money moves in this trade

Kraft paper, board, film, inks and adhesives make up most of the cost, and paper and polymer prices move with their own markets. Every printed job needs cylinders, plates or dies. Every run wastes material while the machine is set up and colours are matched. A long run spreads that make-ready over many units and a short run does not. Yet both are often quoted at a similar rate per thousand.

Brand-owner customers set long payment terms, ask for stock to be held against their call-offs and change artwork at short notice. Printed stock and printed substrate for an old design can only be scrapped. Flexible and multilayer packaging also brings extended producer responsibility considerations for the customer. It can bring them for the converter too, depending on its role.

The problem

Where the numbers usually break down

Make-ready waste is averaged

Set-up waste is spread over all jobs at a fixed percentage, so short runs look more profitable than they are.

Cylinder and plate cost is not recovered

Cylinders, plates and dies are expensed when bought, and recovery from the customer is inconsistent or forgotten on repeat orders.

Obsolete printed stock is never provided for

Finished and semi-finished stock for superseded artwork sits in the warehouse at full value until someone writes it off.

Substrate price moves are not passed on

Paper or film price increases are absorbed on running orders because there is no record of the price each quotation assumed.

Stock held for customers ties up cash

Buffer stock held against call-offs is not tracked by customer, so the working capital each brand consumes is unknown.

What we do

The work, and the result each part produces

Job costing by run length

Substrate, ink, adhesive, make-ready waste, running waste and machine time recorded per job and compared with the quotation.

Short runs are priced for what they cost.

Cylinder, plate and die register

Each item of print tooling recorded with its cost, customer, artwork version and recovery status.

Tooling is recovered and not paid for twice.

Artwork-linked stock control

Printed stock tagged to its artwork version, with exposure reported when a customer announces a change.

Obsolescence is negotiated before the stock is made worthless.

Substrate price tracking against quotations

The paper or film price each quotation assumed recorded and compared with current purchase prices.

Price revision requests are based on evidence.

Customer working-capital view

Receivables, held stock and tooling by customer, set against their payment terms.

The true cost of serving each brand owner is visible.

EPR data support

Quantities and material types supplied to each customer recorded in the form their or your obligations require.

Customers' data requests are answered from the books.

Where we start

The first steps of an engagement

  1. Job tickets and tooling invoices

    We ask for job tickets with make-ready and running waste, substrate purchase records, cylinder, plate and die invoices, quotations for recent jobs and the stock list by artwork.

  2. Short runs against long runs

    Quoted and actual cost are compared for a sample of short and long runs, with make-ready waste separated from running waste.

  3. A print tooling register

    Cylinders, plates and dies are recorded with their customer, artwork version and recovery status, and printed stock is tagged to its artwork.

  4. A job cost and stock-risk report

    The first report shows quoted against actual cost by job and run length, and lists printed stock exposed to artwork changes by customer.

How it is measured

The reports the work is judged on

Each is recorded as a baseline before the work starts, so later reports have an honest comparison.

  • Quoted versus actual cost, by job
  • Make-ready waste by machine and run length
  • Print tooling recovered against spent
  • Obsolete and at-risk printed stock
  • Substrate price assumed against paid
  • Working capital by customer

Who it suits

Written for, and not the right fit for

Not the right fit if
  • You mould or extrude rigid plastic containers rather than print and convert — our plastics processing page is the closer fit.
  • You need EPR registration or returns filed with the regulator — that filing is your own responsibility, and we prepare the data for it.
Written for
  • Corrugated box, folding-carton, label and flexible-packaging converters.
  • Converters serving FMCG, pharmaceutical, food or e-commerce brand owners.
  • Plants where job numbers have grown but job-level costing has not.

Common questions

Questions owners in this trade ask

How should packaging converters price short runs?

By separating make-ready cost from running cost. Once set-up time and waste are known per machine, the quote becomes a fixed set-up charge plus a rate per thousand, and short runs stop subsidising themselves from long ones.

Can a converter claim obsolete printed stock from the customer?

We can show the stock tied to each artwork version and when it was made against the customer's call-off. Whether it can be claimed depends on your agreement, but the claim is much stronger with that record.

Does EPR apply to us or to our customers?

It depends on your role for each product. The rules distinguish producers, importers and brand owners, and since 2024 the definitions also reach makers of plastic raw material and of intermediate material used in packaging. That classification is for you and your adviser; we keep the quantity records any of those roles needs.

Scope and professional coordination

5th Quadrant performs costing, accounting and reporting. Registration, returns and certificates under extended producer responsibility rules are the client's own responsibility with the regulator; we prepare the underlying data and support. Statutory audit and prescribed certifications are signed by an independently engaged licensed professional. Full detail is on our Professional Scope page.

Explore further

Other trades in this sector

Precision engineeringA blended hourly rate hides which parts lose money; we cost each part from the machine hours, tooling and scrap it actually consumed.View trade ↗Industrial machineryEngineered-to-order machines are often costed like catalogue products; we cost each one as its own project, from the first design hour to commissioning.View trade ↗Heavy equipmentWe track every heavy-equipment order's guarantees, delay penalties and staged receivables from tender to final payment, because those decide the margin.View trade ↗Electrical equipmentCopper, aluminium and electrical-steel prices move after the order is priced; we cost metal content per unit and compute every price-variation claim the contract allows.View trade ↗Industrial automationSeparating hardware margin from engineering margin on each project shows whether you earn on expertise or on resale, which a blended project margin hides.View trade ↗Metal fabricationThe gap between steel bought and steel billed is where fabricators lose money; we reconcile steel, scrap and drawing weight on every job.View trade ↗FoundriesPlant-wide yield, melting loss and power figures hide which patterns lose money; costing each pattern from metal poured, good castings shipped and energy used shows them.View trade ↗Forging and precision castingDie and tooling cost is spread across volumes that often never arrive; tracking die life and amortisation part by part against actual output shows what remains unrecovered.View trade ↗Plastics processing and mouldingResin moves weekly and customer prices quarterly, so margin swings unseen; costing each part from resin, regrind and machine time exposes the pass-through gap.View trade ↗Pumps, valves and compressorsCatalogue products and engineered project orders share a plant but not a cost; we separate the two and cost each project from its castings, testing and documentation.View trade ↗
Back to Manufacturing ↗

Tell us how your business actually runs.

Discuss your requirements