Precision engineering · Manufacturing

Finance for precision engineering firms that quote by the part

A precision engineering firm wins on the quote and loses on the job it under-priced. We cost each part from the machine hours, tooling and rejection it actually consumed. The next quote is then built on evidence rather than on last year's hourly rate.

In one paragraph

CNC machining, turned-parts, tool-room and precision-component firms sell machine time, one drawing at a time. Most turn over ₹10–200 crore, and their customers send a drawing and expect a price within days. Every job is slightly different, so a single shop-floor rate hides which parts make money and which quietly lose it. The owner or managing director usually prices the work, often with the finance head.

Who usually engages us

Managing director or owner, often with the finance head

The economics

How the money moves in this trade

A precision shop sells machine time. The cost of a part is the hours it spent on each machine, the tooling it wore out, the material it consumed and the share rejected or reworked. A quote is usually built from a blended hourly rate and an estimated cycle time. Once the job is done, actual cycle time, set-up time and rejection are rarely compared with the estimate.

Customers are often OEMs or tier-one suppliers. They set payment terms, ask for annual price reductions and hold material on consignment or send it for job work. That stretches working capital while it squeezes the margin. Both effects stay invisible until cash runs short.

The problem

Where the numbers usually break down

One hourly rate for every machine

A five-axis machining centre and a manual lathe are charged at the same blended rate, so complex parts are under-priced and simple ones over-priced.

Set-up time is never costed

Short runs carry the same set-up as long ones. When set-up is not recorded against the job, small orders look profitable when they are not.

Rejection sits in a general expense line

Scrapped and reworked parts are written off in bulk, so nobody can see which part number or which customer's tolerance is causing them.

Job-work material is not reconciled

Material received from customers for machining, and material sent out for plating or heat treatment, is tracked on paper and drifts away from the books.

Price reductions are accepted without a cost basis

An annual price-down request is agreed or refused on instinct, because there is no part-level cost to test it against.

What we do

The work, and the result each part produces

Machine-hour rates by machine group

Separate rates for each class of machine, built from depreciation, power, maintenance, operator cost and actual utilisation.

Quotes reflect the machines a part actually uses.

Job costing from the shop-floor record

Actual cycle time, set-up time, tooling and material booked against each job and compared with the quoted estimate.

Every finished job shows whether it made the margin it was priced at.

Rejection and rework costed by part

Scrap and rework recorded in quantity and value against the part number, customer and operation that caused it.

Quality loss becomes a cost someone owns.

Job-work and consignment reconciliation

Material in from customers and out to subcontractors tracked at both ends, with the GST job-work return kept in step.

Stock at other people's premises agrees with the books.

Customer and part profitability

Contribution by customer and by part family, after rejection, freight and payment terms.

Price-down negotiations start from a number, not a feeling.

Working-capital view

Receivables, inventory and work in progress tracked against customer payment terms, with the cash cycle reported monthly.

A cash squeeze is visible before it arrives.

Where we start

The first steps of an engagement

  1. Job cards and machine logs

    We ask for recent job cards, machine logs, rejection notes, the quotation file and the fixed-asset register. We also look at how jobs are booked in your accounting system today.

  2. Quoted against actual on recent jobs

    For a sample of finished jobs, we compare quoted cycle time, set-up and scrap with what the shop-floor record shows.

  3. Rates split by machine group

    Machine-hour rates are rebuilt for each class of machine, and set-up time and rejection start being booked against the job number.

  4. A job-margin report

    The first report shows quoted and actual cost side by side for each sampled job, with the gap split into cycle time, set-up, tooling and rejection.

How it is measured

The reports the work is judged on

Each is recorded as a baseline before the work starts, so later reports have an honest comparison.

  • Quoted versus actual cost, by job
  • Machine utilisation by machine group
  • Rejection and rework cost by part and customer
  • Contribution by customer and part family
  • Job-work stock reconciled at both ends
  • Cash conversion cycle, month by month

Who it suits

Written for, and not the right fit for

Not the right fit if
  • You need your annual audit or tax-audit report signed — an independently engaged CA signs those, though our job-work and stock reconciliations feed into them.
  • You want a new ERP selected and implemented; we work inside the systems you already run.
Written for
  • CNC machining, turned-parts and tool-room firms supplying OEMs or tier-one customers.
  • Owner-run firms that have grown past what the accountant's monthly entries can explain.
  • Firms preparing for a customer audit, a bank renewal or a new machine investment.

Common questions

Questions owners in this trade ask

How should a CNC shop set machine-hour rates?

By machine group rather than as one blended figure. A single rate is fine until your machines differ a lot in cost. Splitting it usually shows that complex parts have been under-priced for years, and it's the complex parts that customers are happiest to give you.

Does job costing need extra paperwork on the shop floor?

A little. Most of what's needed — job cards, machine logs, rejection notes — already exists. The work is in getting it booked against the job consistently, not in creating new paperwork.

How should we respond to an OEM price-down request?

Start from part-level cost. With it in hand you can show which reductions are possible, which would make a part loss-making, and what change in volume or terms would justify them.

Explore further

Other trades in this sector

Industrial machineryEngineered-to-order machines are often costed like catalogue products; we cost each one as its own project, from the first design hour to commissioning.View trade ↗Heavy equipmentWe track every heavy-equipment order's guarantees, delay penalties and staged receivables from tender to final payment, because those decide the margin.View trade ↗Electrical equipmentCopper, aluminium and electrical-steel prices move after the order is priced; we cost metal content per unit and compute every price-variation claim the contract allows.View trade ↗Industrial automationSeparating hardware margin from engineering margin on each project shows whether you earn on expertise or on resale, which a blended project margin hides.View trade ↗Metal fabricationThe gap between steel bought and steel billed is where fabricators lose money; we reconcile steel, scrap and drawing weight on every job.View trade ↗FoundriesPlant-wide yield, melting loss and power figures hide which patterns lose money; costing each pattern from metal poured, good castings shipped and energy used shows them.View trade ↗Forging and precision castingDie and tooling cost is spread across volumes that often never arrive; tracking die life and amortisation part by part against actual output shows what remains unrecovered.View trade ↗Plastics processing and mouldingResin moves weekly and customer prices quarterly, so margin swings unseen; costing each part from resin, regrind and machine time exposes the pass-through gap.View trade ↗PackagingWe cost every packaging job from the board or film consumed, its cylinders or plates and its set-up waste, so short runs are priced for what they cost.View trade ↗Pumps, valves and compressorsCatalogue products and engineered project orders share a plant but not a cost; we separate the two and cost each project from its castings, testing and documentation.View trade ↗
Back to Manufacturing ↗