Engineering R&D services · Software and SaaS
Engineering design programmes costed to completion, milestone by milestone
An engineering R&D firm takes on a design programme priced on effort estimated before the specification was settled. It then bills against milestones the customer's engineers approve. We cost each programme from the engineers, tools and lab time it actually consumes and re-estimate what remains, so overruns appear while there is still time to act.
In one paragraph
Engineering services and R&D firms — embedded software and electronics design, semiconductor design services, mechanical and product design, simulation and testing — usually turn over ₹10–300 crore. Their customers are often global OEMs. Owners and finance heads carry a different cost base from IT services. Design and simulation licences are expensive, prototypes and lab work add spend, and specifications change as long programmes proceed.
Managing director or CEO, often with the head of engineering
The economics
How the money moves in this trade
Revenue is usually a mix of dedicated engineering teams billed monthly and fixed-scope programmes billed on milestones such as design freeze, prototype delivery or validation. Costs include specialist engineers and design and verification licences, which are among the largest costs per engineer. Prototype builds, test equipment and travel to customer sites add more. Most of those costs are shared across programmes and are rarely allocated to them.
Customers expect firm prices while specifications move, so change requests are frequent and often agreed informally. Intellectual property usually passes to the customer. The firm's investment in reusable components and test benches therefore needs a clear accounting treatment. Many firms export most of their services, carrying foreign-currency receivables and export records through long programmes.
The problem
Where the numbers usually break down
Tool licences treated as overhead
Design, simulation and verification licences are expensed centrally, so programmes that depend heavily on them look more profitable than they are.
Milestones billed, effort not tracked against them
Invoices follow customer approvals, but nobody compares effort spent with the share of the programme delivered.
Change requests agreed in meetings
Scope changes are accepted by programme managers without a costed change order, so extra work is delivered free.
Prototype and lab spend scattered
Boards, samples, test fixtures and lab consumables are booked to general purchase heads rather than to the programme that used them.
Reusable assets with no stated treatment
Frameworks, libraries and test benches built in-house are neither tracked as assets nor attributed to the programmes that benefit from them.
What we do
The work, and the result each part produces
Programme costing
Engineer hours, tool-licence seats, lab time, prototypes and travel booked to each programme.
Each programme shows its real cost to date.
Estimate to complete by milestone
Remaining effort re-estimated with programme managers each month and compared with the milestone value left to bill.
Overruns surface before the final milestone.
Tool-licence allocation
Licence cost allocated to programmes by seat usage or hours, with idle seats reported.
Tool cost is priced into bids and unused seats are visible.
Change-order discipline
A costed change order for every scope change, logged against the programme and tracked to billing.
Extra scope is billed rather than absorbed.
Lab and prototype ledger
Prototype, sample and lab purchases tagged to programmes, with test equipment tracked as assets.
Hardware spend is attributed and controlled.
Export receivables view
Milestone invoices tied to remittance records, with foreign-currency receivables aged by customer.
Long programmes do not quietly tie up cash.
Where we start
The first steps of an engagement
Programme contracts and effort data
We ask for programme contracts and milestone schedules, timesheets, tool-licence seat records, lab and prototype purchase records and the change requests on file.
Cost to date by programme
Engineer hours, licence seats, lab time and prototypes are assigned to each programme. Cost to date is compared with the milestone value billed.
Change orders and licence allocation
A costed change order becomes the only route to new scope, and licence cost is allocated to programmes by seat usage.
Programme margin at completion
The first report shows margin to date and estimated margin at completion for each programme, with idle licence seats listed.
How it is measured
The reports the work is judged on
Each is recorded as a baseline before the work starts, so later reports have an honest comparison.
- Programme margin to date and at completion
- Effort spent against milestone value billed
- Tool-licence cost and seat utilisation, by programme
- Change orders raised, approved and billed
- Prototype and lab spend by programme
- Foreign-currency receivables by customer and age
Who it suits
Written for, and not the right fit for
- You need the statutory audit or a transfer-pricing report signed; an independently engaged CA does that.
- You want a research-related tax deduction approved or certified; we prepare the cost records, and eligibility, approval and certification sit with the relevant authority and a licensed professional.
- Embedded, electronics, semiconductor and mechanical design services firms serving OEMs.
- Firms running fixed-scope programmes alongside dedicated engineering teams.
- Indian design centres billing an overseas customer or parent for engineering work.
Services
Services this work draws on
Costing and profitability
What each product, line and customer really contributes.
Explore service ↗MIS and financial planning
Reporting built around the questions you actually need answered.
Explore service ↗Outsourced accounting
Your books kept current and reconciled, closed to a published calendar.
Explore service ↗SEZ and foreign trade advisory
SEZ, EOU and export scheme records kept continuously, not at assessment.
Explore service ↗Every other service, also available in this trade
Common questions
Questions owners in this trade ask
Is programme costing worth it when no two programmes are alike?
That's exactly why it's worth it. Because no two programmes are alike, the only way to know which kinds of work earn money is to cost each one from what it actually consumed.
How do we stop absorbing scope changes?
Make the change order the only route to new scope, and cost it before it's agreed. Customers rarely object to paying for a documented change. They do object to a surprise at the final milestone.
Should reusable frameworks be capitalised?
Possibly, if they meet the recognition criteria, and it's a judgement your auditor will review. We help you set the policy, track the effort and keep the evidence, so the treatment can be examined rather than argued about.
5th Quadrant prepares programme costing, export records and the cost records behind any research-related claim. Approval of such a claim rests with the relevant authority, and statutory audits, transfer-pricing reports and prescribed certifications are signed by an independently engaged licensed professional, coordinated through 5th Quadrant. Full detail is on our Professional Scope page.